A Review on Value Stream Mapping to reduce the Cycle Time of Butterfly Valve

Authors(2) :-Prit Shah, Kinjal Suthar

To stay in Globalize world, industries essential to reduce the cycle time and costs in order to improve operating performance and flexibility. Now days’ company tries to reduction of total lead time and cycle in manufacturing company through lean philosophy. This paper include basic summary of the literature review for the purpose of research on the investigation of use of value stream mapping to enhance productivity by reducing cycle time. The main purpose of this work is to show the use of VSM methodology which were used in assembly of butterfly valve to increase productivity. Value Stream Mapping is a basic and mostly used lean tool to identify and overcome of waste and it cause. VSM is language of lean manager. The review shows that the VSM tool is assure to reduce waste, enhance the productivity and cycle time reduction. Value stream mapping is differ in terms of it able to collect information of individual process, cycle time, up time, available time, change over time, WIP inventory, and manpower requirement.

Authors and Affiliations

Prit Shah
PG Fellow, Department of Mech. Engineering , Parul institute of technology, Vadodara, Gujarat, India
Kinjal Suthar
Faculty of Engg. and tech., Department of Mech. Engineering, Parul institute of technology, Vadodara, Gujarat, India

VSM, Improve Productivity, Cycle Time Reduction, Reduce Waste

  1. Rahani AR, Muhammad al-Ashraf, Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study, ELSEVIER (2012).
  2. Jafri Mohd Rohani, Seyed Mojib Zahraee, Production line analysis via value stream mapping: a lean manufacturing process of color industry, MIMEC2015, 4-6 February 2015
  3. Venkataraman, B.Vijaya Ramnath,V.Muthu Kumar ,C.Elanchezhian., Application of Value Stream Mapping for Reduction of Cycle Time in a Machining Process, (ICMPC 2014)
  4. ChowdhuryS.,HaqueK.A.,SumonM., Implementation of Lean Strategies in a Furniture Manufacturing Factory, (IOSR-JMCE), Volume 12, Feb 2015
  5. Amir Azizi, Designing a Future Value Stream Mapping to Reduce Lead Time using SMED-A Case Study, MIMEC 2015
  6. Monir Hossain, A Study to Reduce the Lead Time of a Bakery Factory by using Lean Tools: A Case Study, International Journal of Scientific and Reserch Publications,Volume5 November 2015
  7. Rumbidzayi Muvunzi. Application of lean value stream mapping to reduce waste and improve productivity:A case of tile manufacturing company in Zimbabwe, IJAIEM, Volume 2, Issue 7,July 2013
  8. Soniya Parihar, Sanjay Jain, Dr. Lokesh Bajpai, Value Stream Mapping: A Case study of Assembly Process, International Journal of Engineering Research & Technology Vol. 1 Issue 8, October-2012
  9. Rahul.R.Joshi, Prof.G.R.Naik, Process Improvement by using Value Stream Mapping:- A Case Study in Small Scale Industry, International Journal of Engineering Research & Technology ,Vol. 1 Issue 5, July-2012
  10. Sriraam S.V, Sridhar.J, Srivanth Viveshwaran, Process Time Reduction in an Electrode Manufacturing Plant using Value Stream Mapping Technique, International Journal of Engineering Research & Technology ,Vol. 6 Issue 05, May-2017
  11. Antonio Pedro Lacerdaa , Ana Raquel Xambrea, Helena Maria Alvelosa, Applying Value Stream Mapping to eliminate waste: a case study of an original equipment manufacturer for the automotive industry, International Journal of Production Research, 2015
  12. Bhim Singh,Suresh K. Garg,Surrender K. Sharma,Value stream mapping: literature review and implication for indian industry,27 july 2017
  13. Santosh B. Dighe , Abhay Kakirde, Lean Manufacturing Implementation Using Value Stream Mapping: A Case study of Pumps Manufacturing Company, International Journal of Science and Research
  14. Manjunath M, Dr. Shivaprasad H. C., Value Stream Mapping as a Tool for Lean Implementation: A Case Study, International journal of innovative research and development, Vol 3 Issue 5, May, 2014
  15. Aravinth Kumar A., Dr. D. Rajenthirakumar, Lean Implementation through Enhancing Productivity in a Pump Industry, International Journal of Engineering Research ISSN:2319-6890) May 2016

Publication Details

Published in : Volume 4 | Issue 5 | March-April 2018
Date of Publication : 2018-04-30
License:  This work is licensed under a Creative Commons Attribution 4.0 International License.
Page(s) : 865-869
Manuscript Number : IJSRST11845172
Publisher : Technoscience Academy

Print ISSN : 2395-6011, Online ISSN : 2395-602X

Cite This Article :

Prit Shah,Kinjal Suthar, " A Review on Value Stream Mapping to reduce the Cycle Time of Butterfly Valve", International Journal of Scientific Research in Science and Technology(IJSRST), Print ISSN : 2395-6011, Online ISSN : 2395-602X, Volume 4, Issue 5, pp.865-869, March-April-2018.
Journal URL : https://ijsrst.com/IJSRST11845172
Citation Detection and Elimination     |      | | BibTeX | RIS | CSV

Article Preview