Analysis of Academic Building By Planning, Scheduling & Resource Allocation Using Oracle® Primavera P6

Authors

  • Vipin Kumar  M.Tech Scholar, Department of Construction Technology Visvesvaraya Technological University, Center for PG Studies, Regional office Kalaburagi-585105, Karnataka, India
  • Dr. Shreenivasreddy Shahpur  Professor & Chairman, Department of Construction Technology Visvesvaraya Technological University, Center for PG Studies, Regional office Kalaburagi-585105, Karnataka, India
  • Maneeth P. D.  Assistant Professor, Department of Construction Technology Visvesvaraya Technological University, Center for PG Studies, Regional office Kalaburagi-585105, Karnataka, India
  • Brijbhushan S.  Assistant Professor, Department of Construction Technology Visvesvaraya Technological University, Center for PG Studies, Regional office Kalaburagi-585105, Karnataka, India

Keywords:

Planning, Scheduling, Resource allocation, Construction management, Oracle® Primavera P6

Abstract

The construction industry emphasizes vital part of a country's Infrastructure and modern construction. The construction industry is the second biggest industry in India still it's construction has been differential the country over. Here emerges the requirement for powerful Project management. Numerous issues are being confronted by the construction business, major of them are cost overwhelms and time invades because of lacking undertaking detailing, lack of foresight for usage and dishonorable management amid execution. Numerous Project Managers express that normal cost of the Project goes up by 30% as of the planned cost because of despicable Planning and scheduling. The first and foremost thing which we can get by effective planning in primavera is Start date of the project and Finish date of the project i'e Start date is 08 December 2016, and Finish date is 29 November 2017. Primavera P6 helps in effectively scheduling the project by assigning two relationships at a time to each activity and considerably reduces the float. Resources allocated to activities can be visually assessed for each activity & can be managed and reassigned at point of time.

References

  1. Unmesh. Y. Polekar & Rohit. R. Salgude, “Planning, Scheduling and Tracking of a residential Project using Primavera Software” International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 Volume 3, Issue 5, May 2015 .
  2. Mohammed ZakiHaider, Rajendra.S & Vijay. K, “Planning Scheduling, Tracking and Application administration Using Primavera Web Logic P6” International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308.
  3. Sushant Pradhan, Rajendra .S &Vijay.K, “Planning, Scheduling and Resource Optimisation of Multiple projects using oracle primavera p6” International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308.
  4. Ranjith Kumar.K, Sridhar.N, Sakthivelu.K, Saran.G4 &Monika.N.R, “Planning and scheduling of commercial building using primavera p6” -case study, ISSN:2348-2079 Volume-5 Issue-1.
  5. B. S. K. Reddy, SK. Nagaraju& MD. Salman, “A Study on Optimisation of Resources for Multiple Projects by Using Primavera” Journal of Engineering Science and Technology Vol. 10, No. 2 (2015) 235 ? 248.
  6. Suhas K B & Prof Vijay K, “Base Line Fixing and Earned Value Analysis in Construction Industry using Primavera” International Journal of Engineering Research & Technology (IJERT) ISSN: 2278-0181 Vol. 5 Issue 08, August-2016.
  7. Cristina Selaru, Resource Allocation in Project Management, “International Journal of Economic Practices and Theories” Vol. 2, No. 4, 2012 (October), e-ISSN 2247?7225.
  8. Vignesh V, “Resource Optimization of Construction Project Using Primavera P6”, IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN: 2278-1684,p-ISSN:2320-334X, Volume 14, Issue 1 Ver. V (Jan. - Feb. 2017), PP 01-08
  9. MD Imran Khan, Maneeth P D & BrijBhushan S, “Project Monitoring And Controlling Using Earned Value Method” International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 02 Issue: 07 | Oct-2015.
  10. Shaik Mohammad Masood & Devanand.R, Harsha H.N, “An Analysis on Resource Planning, Cost Estimation and Tracking of Project by Earned Value Management” International Journal of Engineering and Innovative” Technology (IJEIT) Volume 4, Issue4, October 2014.

Downloads

Published

2017-08-31

Issue

Section

Research Articles

How to Cite

[1]
Vipin Kumar, Dr. Shreenivasreddy Shahpur, Maneeth P. D., Brijbhushan S., " Analysis of Academic Building By Planning, Scheduling & Resource Allocation Using Oracle® Primavera P6, International Journal of Scientific Research in Science and Technology(IJSRST), Online ISSN : 2395-602X, Print ISSN : 2395-6011, Volume 3, Issue 6, pp.518-527, July-August-2017.