Productivity Improvement Of SEEOM Using Industrial Engineering Techniques

Authors

  • Jitendra Patel  PG Scholar, Industrial Engg. Parul Institute of technology, Vadodara, Gujarat, India
  • Kinjal Suthar  Faculty of Engg. and Tech., Department of Mechanical Engg., Parul Institute of technology, Vadodara, Gujarat, India

Keywords:

Method study, Time study, Cycle time, 5s, Productivity

Abstract

Method study technique is used along side of time study. Method study is used for study the method in which way the process is done. Time study is used find the cycle time of each process in the assembly process. Method study and time study concepts are used to increase the productivity of process by reducing different wastes like unnecessary moment, rework etc from process. It reduces work in progress. We can use both technique for optimizing the productivity of assembly shop. Method study and time study are done to improve the productivity of SEEOM (Stored Energy Electrical Operating Mechanism) in the company. Primary data is collected by observation method i.e. by video recording. With method study and time study, 5s technique is also used for proper utilization of space in workplace area. By using 5s technique workplace area can be properly managed and thereby helps in improving the productivity.

References

Downloads

Published

2018-04-30

Issue

Section

Research Articles

How to Cite

[1]
Jitendra Patel, Kinjal Suthar, " Productivity Improvement Of SEEOM Using Industrial Engineering Techniques, International Journal of Scientific Research in Science and Technology(IJSRST), Online ISSN : 2395-602X, Print ISSN : 2395-6011, Volume 4, Issue 5, pp.1474-1480, March-April-2018.