Productivity Improvement Of SEEOM Using Industrial Engineering Techniques
Keywords:
Method study, Time study, Cycle time, 5s, ProductivityAbstract
Method study technique is used along side of time study. Method study is used for study the method in which way the process is done. Time study is used find the cycle time of each process in the assembly process. Method study and time study concepts are used to increase the productivity of process by reducing different wastes like unnecessary moment, rework etc from process. It reduces work in progress. We can use both technique for optimizing the productivity of assembly shop. Method study and time study are done to improve the productivity of SEEOM (Stored Energy Electrical Operating Mechanism) in the company. Primary data is collected by observation method i.e. by video recording. With method study and time study, 5s technique is also used for proper utilization of space in workplace area. By using 5s technique workplace area can be properly managed and thereby helps in improving the productivity.
References
Downloads
Published
Issue
Section
License
Copyright (c) IJSRST

This work is licensed under a Creative Commons Attribution 4.0 International License.