Analysis of Software Project Management Estimation Method using Function Point

Authors

  • Lakshmi Shanker Singh  Research Scholar, Department of Computer Science, Monad University, N.H. 9, Delhi Hapur Road, Hapur, Uttar Pradesh, India
  • Dr. Rupak Sharma  Assistant Professor, S.R.M. Institute of Science, S.R.M. University, NCR Campus, Delhi Meerut Road, Modinagar Ghaziabad, Uttar Pradesh, India

DOI:

https://doi.org//10.32628/IJSRST2075334

Keywords:

Software Project Management, Monitoring Project Resources, Software Product, Development Team

Abstract

Effort estimation has been used for planning and monitoring project resources. As software grew in size and complexity, it is very difficult to predict the development cost. There is no single technique, which is best for all situations. A careful comparison of the results of several approaches is necessary to produce realistic estimates. The use of workforce is measured as effort and defined as total time taken by development team members to perform a given task. It is usually expressed in units such as man-day, man-month, and man-year, which is a basis for estimating other values relevant for software projects, like cost or total time required to produce a software product.

References

  1. Boehm, B. Software Engineering Economics. Englewood CI@, NJ Prentice-Hall (198 1).
  2. Kemerer, C.F. An empirical validation of software cost estimation models. Communications of the ACM vol. 30, no. 5 (May 1987) 416-429.
  3. Albrecht & Gafney. Software function, source lines of code, and development effort prediction: a software science validation, IEEE Transactions on Software Engineering 9, 6 (1983) 639-648.
  4. Mukhopadyay, T., Vicinanza, S.S., Prietula, M.J. Examining the feasibility of a case-based reasoning model for software effort estimation. MIS Quarterly (June 1992) 155-171.
  5. Srinivasan, K., Fisher, D. Machine learning approaches to estimating software development effort. IEEE Transactions on Software Engineering, VOI. 21, no. 2 (February 1995) 126-137.
  6. Briand, L.C., Basili, V.R., Thomas, W.M. A pattern recognition approach for software engineering data analysis. IEEE Transactions on Software Engineering, vol. 18, no. II (1992) 931-942
  7. Allan J. Albrecht May 1984. AD/M Productivity Measurement and Estimation Validation, IBM Corporate Information Systems. IBM Corp.
  8. Barry W. Boehm, Bradford dark, Ellis Horowitz, Chris Westland, Ray Madachy and Richard Selby. Cost Models for Future Software Lifecycle Processes: COCOMO 2.0 Annals of Software Engineering. Volume 1, pp., 57-94, 1995.
  9. Magne Jorgensen. May 2007 Forecasting of Software Development Work Effort: Evidence on Expert Judgment and Formal Model.
  10. Parvinder S. Sandhu, Porush Bassi, and Amanpreet Singh Brar. 2008. Software Effort Estimation Using Soft Computing Techniques. World Academy of Science, Engineering and Technology 46 2008.

Downloads

Published

2020-05-30

Issue

Section

Research Articles

How to Cite

[1]
Lakshmi Shanker Singh, Dr. Rupak Sharma, " Analysis of Software Project Management Estimation Method using Function Point , International Journal of Scientific Research in Science and Technology(IJSRST), Online ISSN : 2395-602X, Print ISSN : 2395-6011, Volume 7, Issue 3, pp.472-478, May-June-2020. Available at doi : https://doi.org/10.32628/IJSRST2075334